Remak DoorMaster D2 Instrukcje Operacyjne Strona 1

Przeglądaj online lub pobierz Instrukcje Operacyjne dla Klimatyzatory typu split Remak DoorMaster D2. Remak DoorMaster D2 Operating instructions Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 28
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
INSTALLATION AND OPERATING INSTRUCTIONS
Air curtains C1, D2
04/2013
Przeglądanie stron 0
1 2 3 4 5 6 ... 27 28

Podsumowanie treści

Strona 1 - Air curtains C1, D2

INSTALLATION AND OPERATING INSTRUCTIONSAir curtains C1, D204/2013

Strona 2

10Air curtainsInstallation, Media ConnectionFigure 10 - mounting on the threaded bars (C1)Figure 12 - mounting on the threaded bars (D2)Figure 11 - mo

Strona 3

11Air curtainsTable 1 – main switches and protection1) low-voltage switching trigger 2) Lockable main switch with at least 3 mm distant contacts Wirin

Strona 4

12Air curtainsWiring and CommissioningFigure 14 – WAGO terminalsAs standard, the DoorMaster COMFORT air curtains are designed to be controlled by remo

Strona 5

13Air curtainsAccessory Installationstat 80°C, operation thermostat 60°C) is forbidden.  It is forbidden to operate the electric heater without the

Strona 6

14Air curtainsFigure 16 – Thermo-valve sensor installation, C1 Figure 17 – Thermo-valve sensor installation, D2Figure 18 – TVW-R Thermostatic Valve In

Strona 7

15Air curtainsFigure 21 – Room thermostatsRAA 10Heating output control using a room thermostatApplication:- C1-E1 E2 air curtains (electric heater)-

Strona 8

16Air curtainsWiring diagramsFigure 22 – C1-E1 air curtains connectionX1 - Main power connection (supply)L1+L2+L3+N+PE - Input voltage terminals TK-T

Strona 9

17Air curtainsFigure 25 – C1-E2/TR air curtains connectionX1 - Main power connection (supply)L1+L2+L3+N+PE - Input voltage terminals TK-TK - under-vo

Strona 10 - Air curtains

18Air curtainsFigure 26 – C1-W and C1-N air curtains connectionWiring diagramsX1 - Main power connection (supply)L+N+PE - Input voltage terminalsDK1-

Strona 11

19Air curtainsFigure 29 – D2-W and D2-N air curtains connectionX1 - Main cower connection (supply)L+N+PE - Input voltage terminalsDK-DK - Door contac

Strona 12

2Air curtainsContentsApplication, Operating Conditions and Construction ...3Designations, st

Strona 13

20Air curtainsTable 3 – Possible control according to air curtain typeWiring diagramsFigure 30 – control of chained C1 air curtains using an internal

Strona 14

21Air curtainsAir Curtain ChainingFigure 31 – Mechanical Connection of C1 seriesObserving all instructions of the Installation Instructions Manual, su

Strona 15

22Air curtainsOperating and Maintenance InstructionsFigure 32 – Mechanical connection pointsFigure 33 – Mechanical connection points, D2D29 side hole

Strona 16

23Air curtainsTable 4 – Operation checks Maintenance and Screening ChecksFigure 34 – Filter insert brace installationScreening Checks and Maintenanc

Strona 17

24Air curtainsNáhradní díly, servisTroubleshooting The heat-exchanging surface of the exchanger can be vacuumed or blown through. To remove deeper d

Strona 18

25Air curtainsSpare parts, service and disposalCheck procedure:Verify the air curtain control possibilities, refer to table #9 on page 20.Using

Strona 19

26Air curtainsPrinting and language mistakes are reserved.These Installation and Operating Instructions (as a whole or a part) must not be printed or

Strona 20

27Air curtains

Strona 21

REMAK a.s.Zuberská 2601, 756 61 Rožnov pod Radhoštěm,tel.: +420 571 877 878, fax: +420 571 877 877,email: [email protected], internet: www.remak.cz Výrob

Strona 22

3Air curtainsApplication, Operating Conditions and ConstructionInformation from the manufacturerDoorMaster door curtains are manufactured in compli-an

Strona 23

4Air curtainsDesignation, Storage and DispatchThe covering sidewalls are laminated. The intake panel has an integrated lter insert (G1). The exhaust

Strona 24

5Air curtainsInstallation, mountingRules for location - correct installationInstall the curtains above the entrance door with the outlet slot near the

Strona 25

6Air curtainsDimensionsFigure 6 - dimensions of the curtains in the C1 series***Figure 7 - basic dimensions of the curtains in the D2 seriesSize AZAV

Strona 26

7Air curtainsArrangementsterminals for the electrical connectionadjustable outlet screenremovable intake panelconnections for the mediaplastic sidewal

Strona 27

8Air curtainsTechnical parametersWater heatingLow-temperatureElectric heating E2Electric heating E1E2E1WN* Acoustic pressure at a distance of 3.0 m,

Strona 28 - REMAK a.s

9Air curtainsTechnical parameters* Acoustic pressure at a distance of 3.0 m, directional factor 2 and absorption surface 200 m2** Acoustic output ac

Komentarze do niniejszej Instrukcji

Brak uwag